News
With the addition of the Yellow Line, the total length of Bengaluru’s metro network will extend to 96.1 km, of which 53.8 km ...
Bengaluru Metro’s Yellow Line opens August 10, connecting RV Road to Bommasandra with 16 stations. Expected to ease traffic ...
The Yellow Line, a key addition to the city's expanding metro network, spans 19.15 kilometers, connecting RV Road in the ...
Initially, daily ridership is projected at 25,000, generating ₹10–15 lakh revenue, potentially exceeding ₹60 lakh once full ...
Bengaluru is gearing up for a major boost in its transport infrastructure. Prime Minister Narendra Modi will inaugurate the ...
1d
NDTV Profit on MSNBengaluru Metro Yellow Line Inauguration: Date, Timings, Route, Stations, Project Cost And MoreThe new Yellow Line, running 19.15 km will connect RV Road to the Bommasandra region and will include 16 stations ...
Bengaluru is all set to add another milestone to its expanding metro rail network with the inauguration of the Namma Metro ...
Bengaluru: The long-awaited inauguration of the Namma Metro Yellow Line is finally set to become a reality. Prime Minister ...
1d
Press Trust of India on MSNPM Modi to inaugurate Bengaluru's yellow line metro, launch phase-3 on Aug 10The yellow line will serve eight lakh riders and alleviate the Silk Board traffic jam, benefiting 25 lakh people.
As Prime Minister Narendra Modi is set to inaugurate the long-delayed Yellow Line of Namma Metro on August 10, commuters say ...
The Yellow Line, built at a cost of Rs 5,056.99 crore, features 16 stations and is expected to significantly ease traffic congestion, especially at the infamously congested Silk Board Junction.
The Bengaluru Metro yellow line, originally delayed by 2.5 years, is set to be inaugurated by the Prime Minister on August 10 ...
Results that may be inaccessible to you are currently showing.
Hide inaccessible results